Takhte Jamshid Petrochemical Complex (TJPC) has been built and put into operation in two phases, the first phase of which includes the production of styrene butadiene rubber elastomer (SBR) by cold polymerization with a capacity of & nbsp; Nominal 30,000 tons per year with GOODYREAR technology and a production unit of polybutadiene rubber (PBR) by solution polymerization method with Zigglernata catalyst with a nominal capacity of 12,000 tons per year with BF GOODRICH technology, which started operating in December 2012 And in the first half of 1393, it was put into operation.
The construction of the second phase, including a production unit of polybutadiene rubber (PBR) by solution polymerization method with Zigglernata catalyst with a nominal capacity of 50,000 tons per year with completely local knowledge, began in December 2017 and all stages of engineering, purchase and execution and It was set up by specialists and internal experts of the company and was put into operation in the second half of 1398.